Mark Center's OHP Ramp.

Deep Bowl FrameĀ 

Needs to have an alt tag: 16_Deep_Bowl_Frame_1_09142003_2nd_Try_1.JPG

Prev

Next

September 14, 2003

As you can see, I've put all but the top joists in! Those I put in last to make certain that the top is level and such. 80% of the joists are cut correctly, the remaining ones I'll have to shim out, as they are holdovers from my last attempt, but, they're close enough. Another weekend to brace it up, shim out the odd problem joists, frame out the bottom and pour a bit of concrete, in stall the drain and then I'm ready for the 3 layers of plywood. After that? It's on to the shallow end!?!