Mark Center's OHP Ramp.
Shallow Flat and Roll inĀ
Another FFEM project.
|
Prev |
Next |
October 20, 2003
Over the last two weekends I've been struggling to get the shallow walls and the tranny (water fall) from the 3 foot high flat to the existing half pipe bottom done. And here I thought this would be easier? No way! Much tougher, many more angles and such to deal with. I'm shooting for Thanksgiving weekend to start laying the ply? Take a look at the new work: